Craig, OK interconnection queue
1 active project totaling 148 MW in the SPP queue, plus 7 with terminal status (shown grayed).
1active projects
148active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-179 | Not reported | 138 | 250 | Solar | Withdrawn |
| GEN-2024-146 | Not reported | 138 | 250 | Solar | Withdrawn |
| GEN-2018-080 | Not reported | 345 | 200 | Solar | Withdrawn |
| GEN-2024-238 | Not reported | 138 | 200 | Wind | Withdrawn |
| GEN-2023-136 | Not reported | 138 | 150 | Hybrid | Withdrawn |
| GEN-2018-079 | Not reported | 138 | 148 | Solar | Active |
| GEN-2013-009 | Not reported | 138 | 100.3 | Wind | Withdrawn |
| GEN-2024-160 | Not reported | 161 | 100 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.