Substation Scout

SPP request GEN-2018-067

SPP queue ID GEN-2018-067

Queue request GEN-2018-067 was listed in the SPP interconnection queue at the end of 2025 as a 255 MW wind project in Williams County, ND, according to Berkeley Lab’s queue data file. The filing names Strandahl sub as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2028.

Queue IDGEN-2018-067
Project nameNot reported
Status (as published)Active
SubstationStrandahl sub
Point of interconnection115kV Strandahl sub
CountyWilliams
StateND
Voltage115 kV
Capacity255 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Williams, ND: 13 requests in the SPP queue, 8 active totaling 2,870 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMWEC
ClusterDISIS-2018-002; 01 NORTH
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2018-10-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.