Williams, ND interconnection queue
8 active projects totaling 2,870 MW in the SPP queue, plus 5 with terminal status (shown grayed).
8active projects
2,870active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-081 | Not reported | 345 | 745 | Gas | Active |
| GEN-2024-082 | Not reported | 345 | 745 | Gas | Active |
| GEN-2015-046 | Not reported | 345 | 300 | Wind | Operational |
| GEN-2017-048 | Not reported | 230 | 300 | Wind | Withdrawn |
| GEN-2018-067 | Not reported | 115 | 255 | Wind | Active |
| GEN-2022-010 | Not reported | 345 | 250 | Other | Active |
| GEN-2022-083 | Not reported | 345 | 250 | Gas | Active |
| GEN-2023-097 | Not reported | 345 | 250 | Battery | Withdrawn |
| GEN-2024-329 | Not reported | 115 | 200 | Battery | Active |
| GEN-2022-037 | Not reported | 115 | 181 | Wind | Withdrawn |
| GEN-2022-009 | Not reported | 345 | 125 | Other | Active |
| GEN-2023-062 | Not reported | 115 | 98 | Gas | Withdrawn |
| GEN-2019-020 | Not reported | 115 | 35 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.