Williams, ND interconnection queue

8 active projects totaling 2,870 MW in the SPP queue, plus 5 with terminal status (shown grayed).

8active projects
2,870active MW
13total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-081 Not reported 345 745 Gas Active
GEN-2024-082 Not reported 345 745 Gas Active
GEN-2015-046 Not reported 345 300 Wind Operational
GEN-2017-048 Not reported 230 300 Wind Withdrawn
GEN-2018-067 Not reported 115 255 Wind Active
GEN-2022-010 Not reported 345 250 Other Active
GEN-2022-083 Not reported 345 250 Gas Active
GEN-2023-097 Not reported 345 250 Battery Withdrawn
GEN-2024-329 Not reported 115 200 Battery Active
GEN-2022-037 Not reported 115 181 Wind Withdrawn
GEN-2022-009 Not reported 345 125 Other Active
GEN-2023-062 Not reported 115 98 Gas Withdrawn
GEN-2019-020 Not reported 115 35 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.