SPP request GEN-2018-064

SPP queue ID GEN-2018-064

Queue request GEN-2018-064 was listed in the SPP interconnection queue at the end of 2025 as a 80 MW solar project in Benton County, AR, according to Berkeley Lab’s queue data file. The filing names Tonnece Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 11, 2027.

Queue IDGEN-2018-064
Project nameNot reported
Status (as published)Active
SubstationTonnece Substation
Point of interconnectionTonnece Substation 69kV
CountyBenton
StateAR
Voltage69 kV
Capacity80 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-07-11
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Benton, AR: 9 requests in the SPP queue, 1 active totaling 80 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGRDA
ClusterDISIS-2018-002; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2018-10-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first