Substation Scout

Benton, AR interconnection queue

1 active project totaling 80 MW in the SPP queue, plus 8 with terminal status (shown grayed).

1active projects
80active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-235 Not reported 345 250 Battery Withdrawn
GEN-2022-058 Not reported 161 180 Solar Withdrawn
GEN-2008-012 Not reported n/r 150 Wind Withdrawn
GEN-2023-213 Not reported 161 100 Battery Withdrawn
GEN-2023-232 Not reported 161 90 Battery Withdrawn
GEN-2018-064 Not reported 69 80 Solar Active
GEN-2022-099 Not reported 161 80 Hybrid Withdrawn
GEN-2017-076 Not reported 161 52.2 Solar Withdrawn
GEN-2010-025 Not reported 161 20 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.