Benton, AR interconnection queue
1 active project totaling 80 MW in the SPP queue, plus 8 with terminal status (shown grayed).
1active projects
80active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-235 | Not reported | 345 | 250 | Battery | Withdrawn |
| GEN-2022-058 | Not reported | 161 | 180 | Solar | Withdrawn |
| GEN-2008-012 | Not reported | n/r | 150 | Wind | Withdrawn |
| GEN-2023-213 | Not reported | 161 | 100 | Battery | Withdrawn |
| GEN-2023-232 | Not reported | 161 | 90 | Battery | Withdrawn |
| GEN-2018-064 | Not reported | 69 | 80 | Solar | Active |
| GEN-2022-099 | Not reported | 161 | 80 | Hybrid | Withdrawn |
| GEN-2017-076 | Not reported | 161 | 52.2 | Solar | Withdrawn |
| GEN-2010-025 | Not reported | 161 | 20 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.