SPP request GEN-2018-057

SPP queue ID GEN-2018-057

Queue request GEN-2018-057 was listed in the SPP interconnection queue at the end of 2025 as a 203.4 MW solar project in Sedgwick County, KS, according to Berkeley Lab’s queue data file. The filing names Gordon Evans as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 15, 2030.

Queue IDGEN-2018-057
Project nameNot reported
Status (as published)Active
SubstationGordon Evans
Point of interconnectionGordon Evans 138kV
CountySedgwick
StateKS
Voltage138 kV
Capacity203.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2030-05-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sedgwick, KS: 15 requests in the SPP queue, 8 active totaling 1,398.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2018-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2018-05-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.