Sedgwick, KS interconnection queue
8 active projects totaling 1,398.2 MW in the SPP queue, plus 7 with terminal status (shown grayed).
8active projects
1,398.2active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2006-029 | Not reported | n/r | 300 | Gas | Withdrawn |
| GEN-2024-166 | Not reported | 138 | 275 | Hybrid | Active |
| GEN-2017-179 | Not reported | 138 | 222 | Wind | Withdrawn |
| GEN-2018-057 | Not reported | 138 | 203.4 | Solar | Active |
| GEN-2017-220 | Not reported | 345 | 201.6 | Solar | Active |
| GEN-2017-226 | Not reported | 138 | 201.6 | Solar | Active |
| GEN-2017-227 | Not reported | 138 | 201.6 | Battery | Active |
| GEN-2023-186 | Not reported | 138 | 200 | Hybrid | Withdrawn |
| GEN-2017-221 | Not reported | 345 | 152 | Battery | Active |
| GEN-2023-034 | Not reported | 138 | 130 | Solar | Active |
| GEN-2021-061 | Not reported | 138 | 100 | Solar | Withdrawn |
| GEN-2018-093 | Not reported | 138 | 60 | Battery | Withdrawn |
| GEN-2022-004 | Not reported | 138 | 33 | Solar | Active |
| GEN-2017-163 | Not reported | 345 | 25 | Wind | Withdrawn |
| GEN-2024-342 | Not reported | 69 | 22.8 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.