Sedgwick, KS interconnection queue

8 active projects totaling 1,398.2 MW in the SPP queue, plus 7 with terminal status (shown grayed).

8active projects
1,398.2active MW
15total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-029 Not reported n/r 300 Gas Withdrawn
GEN-2024-166 Not reported 138 275 Hybrid Active
GEN-2017-179 Not reported 138 222 Wind Withdrawn
GEN-2018-057 Not reported 138 203.4 Solar Active
GEN-2017-220 Not reported 345 201.6 Solar Active
GEN-2017-226 Not reported 138 201.6 Solar Active
GEN-2017-227 Not reported 138 201.6 Battery Active
GEN-2023-186 Not reported 138 200 Hybrid Withdrawn
GEN-2017-221 Not reported 345 152 Battery Active
GEN-2023-034 Not reported 138 130 Solar Active
GEN-2021-061 Not reported 138 100 Solar Withdrawn
GEN-2018-093 Not reported 138 60 Battery Withdrawn
GEN-2022-004 Not reported 138 33 Solar Active
GEN-2017-163 Not reported 345 25 Wind Withdrawn
GEN-2024-342 Not reported 69 22.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.