Substation Scout

SPP request GEN-2017-210

SPP queue ID GEN-2017-210

Queue request GEN-2017-210 was listed in the SPP interconnection queue at the end of 2025 as a 310 MW solar project in Cedar County, NE, according to Berkeley Lab’s queue data file. The filing names McCool Substation as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of December 1, 2026.

Queue IDGEN-2017-210
Project nameNot reported
Status (as published)Suspended
SubstationMcCool Substation
Point of interconnectionMcCool 345kV Substation
CountyCedar
StateNE
Voltage345 kV
Capacity310 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cedar, NE: 4 requests in the SPP queue, 1 active totaling 310 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNPPD
ClusterDISIS-2017-002; 02 NEBRASKA
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Suspended
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SUSPENSION
Queue date2017-11-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.