Cedar, NE interconnection queue

1 active project totaling 310 MW in the SPP queue, plus 3 with terminal status (shown grayed).

1active projects
310active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-210 Not reported 345 310 Solar Suspended
GEN-2017-212 Not reported 345 310 Solar Withdrawn
GEN-2006-038N010 Not reported n/r 200 Wind Withdrawn
GEN-2015-076 Not reported 115 158.4 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.