Substation Scout

SPP request GEN-2017-018

SPP queue ID GEN-2017-018

Queue request GEN-2017-018 was listed in the SPP interconnection queue at the end of 2025 as a 189 MW solar project in Barber County, KS, according to Berkeley Lab’s queue data file. The filing names Thistle sub as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 30, 2025.

Queue IDGEN-2017-018
Project nameNot reported
Status (as published)Active
SubstationThistle sub
Point of interconnectionThistle 345 kV sub
CountyBarber
StateKS
Voltage345 kV
Capacity189 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-04-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Barber, KS: 14 requests in the SPP queue, 4 active totaling 677.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITCGP
ClusterDISIS-2017-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2017-05-30
Operational date2025-04-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first