Barber, KS interconnection queue

4 active projects totaling 677.2 MW in the SPP queue, plus 10 with terminal status (shown grayed).

4active projects
677.2active MW
14total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-073 Not reported n/r 300 Wind Withdrawn
GEN-2008-074 Not reported n/r 300 Wind Withdrawn
GEN-2008-075 Not reported n/r 300 Wind Withdrawn
GEN-2008-076 Not reported n/r 300 Wind Withdrawn
GEN-2007-025 Not reported 345 299.2 Wind Operational
GEN-2017-018 Not reported 345 189 Solar Active
GEN-2011-041 Not reported 345 150 Wind Withdrawn
GEN-2011-042 Not reported 345 150 Wind Withdrawn
GEN-2011-043 Not reported 345 150 Wind Withdrawn
GEN-2011-044 Not reported 345 150 Wind Withdrawn
GEN-2012-023 Not reported 345 115 Wind Withdrawn
GEN-2008-059 Not reported n/r 100.8 Wind Withdrawn
GEN-2018-108 Not reported 345 95 Battery Active
GEN-2006-021 Not reported 138 94 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.