Queue request GEN-2017-010 was listed in the SPP interconnection queue at the end of 2025 as a 200.1 MW wind project in Bowman County, ND, according to Berkeley Lab’s queue data file. The filing names Rhame Sub as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 12, 2025.

Queue IDGEN-2017-010
Project nameNot reported
Status (as published)Operational
SubstationRhame Sub
Point of interconnectionRhame 230 kV Sub
CountyBowman
StateND
Voltage230 kV
Capacity200.1 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2025-12-12
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bowman, ND: 3 requests in the SPP queue, 1 active totaling 200.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityBEPC
ClusterDISIS-2017-001; 01 NORTH
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2017-04-14
Operational date2025-12-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first