Bowman, ND interconnection queue

1 active project totaling 200.1 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
200.1active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-006 Not reported 230 250 Solar Withdrawn
GEN-2017-010 Not reported 230 200.1 Wind Operational
GEN-2022-078 Not reported 230 180 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.