Bowman, ND interconnection queue
1 active project totaling 200.1 MW in the SPP queue, plus 2 with terminal status (shown grayed).
1active projects
200.1active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2020-006 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2017-010 | Not reported | 230 | 200.1 | Wind | Operational |
| GEN-2022-078 | Not reported | 230 | 180 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.