SPP queue ID GEN-2016-075

Queue request GEN-2016-075 was listed in the SPP interconnection queue at the end of 2025 as a 50 MW wind project in Holt County, NE, according to Berkeley Lab’s queue data file. The filing names Fort Thompson-Grand Island (Grand Prairie) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2027.

Queue IDGEN-2016-075
Project nameNot reported
Status (as published)Active
SubstationFort Thompson-Grand Island (Grand Prairie)
Point of interconnectionFort Thompson-Grand Island (Grand Prairie) 345kV
CountyHolt
StateNE
Voltage345 kV
Capacity50 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2027-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Holt, NE: 10 requests in the SPP queue, 2 active totaling 250 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWAPA
ClusterDISIS-2016-001-3; 02 NEBRASKA
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2016-03-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.