Holt, NE interconnection queue

2 active projects totaling 250 MW in the SPP queue, plus 8 with terminal status (shown grayed).

2active projects
250active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-200 Not reported 345 300 Wind Withdrawn
GEN-2017-165 Not reported 345 288 Wind Withdrawn
GEN-2017-138 Not reported 345 252 Wind Withdrawn
GEN-2017-139 Not reported 345 252 Wind Withdrawn
GEN-2017-144 Not reported 345 200 Wind Active
GEN-2010-039 Not reported 115 150.4 Wind Withdrawn
GEN-2007-011N03 Not reported n/r 100 Wind Withdrawn
GEN-2007-011N04 Not reported n/r 100 Wind Withdrawn
GEN-2005-009N Not reported n/r 50 Coal Withdrawn
GEN-2016-075 Not reported 345 50 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first