SPP request GEN-2016-036

SPP queue ID GEN-2016-036

Queue request GEN-2016-036 was listed in the SPP interconnection queue at the end of 2025 as a 44.6 MW wind project in Chippewa County, MN, according to Berkeley Lab’s queue data file. The filing names Granite Falls substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 30, 2018.

Queue IDGEN-2016-036
Project nameNot reported
Status (as published)Operational
SubstationGranite Falls substation
Point of interconnectionGranite Falls 115kV substation
CountyChippewa
StateMN
Voltage115 kV
Capacity44.6 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2018-12-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Chippewa, MN: 2 requests in the SPP queue, 1 active totaling 44.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWAPA
ClusterDISIS-2016-002-1; 01 NORTH
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2016-03-28
Operational date2018-12-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.