Chippewa, MN interconnection queue

1 active project totaling 44.6 MW in the SPP queue, plus 1 with terminal status (shown grayed).

1active projects
44.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-036 Not reported 115 44.6 Wind Operational
GEN-2017-103 Not reported 230 8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.