SPP request GEN-2015-064
SPP queue ID GEN-2015-064
Queue request GEN-2015-064 was listed in the SPP interconnection queue at the end of 2025 as a 197.8 MW wind project in Thomas County, KS, according to Berkeley Lab’s queue data file. The filing names Mingo as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 26, 2020.
| Queue ID | GEN-2015-064 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Mingo |
| Point of interconnection | Mingo 115kV |
| County | Thomas |
| State | KS |
| Voltage | 115 kV |
| Capacity | 197.8 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2020-03-26 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Mingo substation: 11 requests in the SPP queue, 3 active totaling 473.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| GEN-2015-065 | Not reported | 202.4 | Wind | Operational |
| GEN-2016-067 | Not reported | 73.6 | Wind | Operational |
| GEN-2015-012 | Not reported | 300.1 | Wind | Withdrawn |
| GEN-2014-015 | Not reported | 300.1 | Wind | Withdrawn |
| GEN-2015-061 | Not reported | 200 | Wind | Withdrawn |
| GEN-2017-013 | Not reported | 200 | Wind | Withdrawn |
| GEN-2015-011 | Not reported | 172 | Gas | Withdrawn |
| GEN-2015-017 | Not reported | 172 | Gas | Withdrawn |
| GEN-2006-040 | Not reported | 108 | Wind | Withdrawn |
| GEN-2017-083 | Not reported | 100 | Wind | Withdrawn |
Thomas, KS: 13 requests in the SPP queue, 3 active totaling 473.8 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | SUNC |
|---|---|
| Cluster | DISIS-2015-002-7; 03 CENTRAL |
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | IA FULLY EXECUTED/COMMERCIAL OPERATION |
| Queue date | 2015-10-07 |
| Operational date | 2020-03-26 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.