Thomas, KS interconnection queue

3 active projects totaling 473.8 MW in the SPP queue, plus 10 with terminal status (shown grayed).

3active projects
473.8active MW
13total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-026 Not reported n/r 300 Wind Withdrawn
GEN-2007-047 Not reported n/r 204 Wind Withdrawn
GEN-2015-065 Not reported 345 202.4 Wind Operational
GEN-2017-013 Not reported 345 200 Wind Withdrawn
GEN-2017-017 Not reported 345 200 Wind Withdrawn
GEN-2015-064 Not reported 115 197.8 Wind Operational
GEN-2015-011 Not reported 115 172 Gas Withdrawn
GEN-2015-017 Not reported 115 172 Gas Withdrawn
GEN-2006-040 Not reported 115 108 Wind Withdrawn
GEN-2012-026 Not reported 115 100 Gas Withdrawn
GEN-2017-083 Not reported 115 100 Wind Withdrawn
GEN-2016-067 Not reported 345 73.6 Wind Operational
GEN-2006-041S Not reported n/r 19.8 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.