Substation Scout

SPP request GEN-2015-016

SPP queue ID GEN-2015-016

Queue request GEN-2015-016 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW wind project in Allen County, KS, according to Berkeley Lab’s queue data file. The filing names Tap Marmaton - Centerville as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 11, 2019.

Queue IDGEN-2015-016
Project nameNot reported
Status (as published)Operational
SubstationTap Marmaton - Centerville
Point of interconnectionTap Marmaton - Centerville 161kV
CountyAllen
StateKS
Voltage161 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2019-09-11
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Allen, KS: 5 requests in the SPP queue, 2 active totaling 500 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityKCPL
ClusterDISIS-2015-001-4; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2015-03-20
Operational date2019-09-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first