Allen, KS interconnection queue

2 active projects totaling 500 MW in the SPP queue, plus 3 with terminal status (shown grayed).

2active projects
500active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-258 Not reported 345 300 Wind Active
GEN-2016-157 Not reported 345 252 Wind Withdrawn
GEN-2016-158 Not reported 345 252 Wind Withdrawn
GEN-2015-016 Not reported 161 200 Wind Operational
GEN-2020-089 Not reported 161 104 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.