Substation Scout

SPP request GEN-2015-013

SPP queue ID GEN-2015-013

Queue request GEN-2015-013 was listed in the SPP interconnection queue at the end of 2025 as a 120 MW solar project in Kiowa County, OK, according to Berkeley Lab’s queue data file. The filing names Snyder as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 1, 2024.

Queue IDGEN-2015-013
Project nameNot reported
Status (as published)Operational
SubstationSnyder
Point of interconnectionSnyder 138kV
CountyKiowa
StateOK
Voltage138 kV
Capacity120 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Kiowa, OK: 7 requests in the SPP queue, 3 active totaling 360 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterDISIS-2015-001-4; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2015-03-31
Operational date2024-05-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first