3 active projects totaling 360 MW in the SPP queue, plus 4 with terminal status (shown grayed).

3active projects
360active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-062 Not reported 345 200.1 Wind Withdrawn
GEN-2024-133 Not reported 138 196.1 Wind Withdrawn
GEN-2024-157 Not reported 138 140 Solar Active
GEN-2015-013 Not reported 138 120 Solar Operational
GEN-2009-066 Not reported 138 102 Wind Withdrawn
GEN-2012-029 Not reported 138 100.3 Wind Withdrawn
GEN-2017-036 Not reported 138 100 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.