SPP request GEN-2013-012

SPP queue ID GEN-2013-012

Queue request GEN-2013-012 was listed in the SPP interconnection queue at the end of 2025 as a 147 MW gas project in Logan County, OK, according to Berkeley Lab’s queue data file. The filing names Redbud as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 11, 2014.

Queue IDGEN-2013-012
Project nameNot reported
Status (as published)Operational
SubstationRedbud
Point of interconnectionRedbud 345kV
CountyLogan
StateOK
Voltage345 kV
Capacity147 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2014-08-11
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Logan, OK: 8 requests in the SPP queue, 2 active totaling 297 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2013-001-4; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2013-03-28
Operational date2014-08-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.