Logan, OK interconnection queue

2 active projects totaling 297 MW in the SPP queue, plus 6 with terminal status (shown grayed).

2active projects
297active MW
8total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-228 Not reported 345 335 Solar Withdrawn
GEN-2018-076 Not reported 138 200 Solar Withdrawn
GEN-2018-127 Not reported 138 200 Solar Withdrawn
GEN-2022-229 Not reported 345 200 Battery Withdrawn
GEN-2022-230 Not reported 345 200 Battery Withdrawn
GEN-2022-231 Not reported 138 166 Solar Withdrawn
GEN-2024-029 Not reported 138 150 Battery Active
GEN-2013-012 Not reported 345 147 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.