Substation Scout

SPP request GEN-2012-021

SPP queue ID GEN-2012-021

Queue request GEN-2012-021 was listed in the SPP interconnection queue at the end of 2025 as a 4.8 MW gas project in Lancaster County, NE, according to Berkeley Lab’s queue data file. The filing names Terry Bundy Generating Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2013.

Queue IDGEN-2012-021
Project nameNot reported
Status (as published)Operational
SubstationTerry Bundy Generating Station
Point of interconnectionTerry Bundy Generating Station 115kV
CountyLancaster
StateNE
Voltage115 kV
Capacity4.8 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2013-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lancaster, NE: 39 requests in the SPP queue, 22 active totaling 3,912.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityLES
ClusterDISIS-2012-002-6; 02 NEBRASKA
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2012-09-26
Operational date2013-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.