Substation Scout

SPP request GEN-2011-050

SPP queue ID GEN-2011-050

Queue request GEN-2011-050 was listed in the SPP interconnection queue at the end of 2025 as a 108 MW wind project in Grady County, OK, according to Berkeley Lab’s queue data file. The filing names Tap Rush Springs ¬Å- Marlow as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 13, 2016.

Queue IDGEN-2011-050
Project nameNot reported
Status (as published)Operational
SubstationTap Rush Springs - Marlow
Point of interconnectionTap Rush Springs - Marlow 138kV
CountyGrady
StateOK
Voltage138 kV
Capacity108 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2016-12-13
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grady, OK: 25 requests in the SPP queue, 16 active totaling 2,557.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2011-002-6; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2011-09-30
Operational date2016-12-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first