Substation Scout

SPP request GEN-2010-057

SPP queue ID GEN-2010-057

Queue request GEN-2010-057 was listed in the SPP interconnection queue at the end of 2025 as a 201 MW wind project in Lincoln County, KS, according to Berkeley Lab’s queue data file. The filing names Rice County as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 28, 2012.

Queue IDGEN-2010-057
Project nameNot reported
Status (as published)Operational
SubstationRice County
Point of interconnectionRice County 230kV
CountyLincoln
StateKS
Voltage230 kV
Capacity201 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2012-09-28
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lincoln, KS: 5 requests in the SPP queue, 1 active totaling 201 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDW
ClusterDISIS-2011-001-8; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2010-10-27
Operational date2012-09-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.