Queue IDProjectkVMWResourceStatus
GEN-2023-149 Not reported 345 300 Battery Withdrawn
GEN-2010-057 Not reported 230 201 Wind Operational
GEN-2008-061 Not reported n/r 150 Wind Withdrawn
GEN-2008-068 Not reported n/r 150 Wind Withdrawn
GEN-2021-013 Not reported 230 74.9 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.