Substation Scout

SPP request GEN-2010-036

SPP queue ID GEN-2010-036

Queue request GEN-2010-036 was listed in the SPP interconnection queue at the end of 2025 as a 4.6 MW hydro project in Douglas County, KS, according to Berkeley Lab’s queue data file. The filing names 6th Street as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 1, 2012.

Queue IDGEN-2010-036
Project nameNot reported
Status (as published)Operational
Substation6th Street
Point of interconnection6th Street 115kV
CountyDouglas
StateKS
Voltage115 kV
Capacity4.6 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2012-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Douglas, KS: 6 requests in the SPP queue, 2 active totaling 163.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2010-002-6; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2010-06-30
Operational date2012-08-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first