Douglas, KS interconnection queue

2 active projects totaling 163.6 MW in the SPP queue, plus 4 with terminal status (shown grayed).

2active projects
163.6active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-101 Not reported 115 159 Solar Active
GEN-2013-043 Not reported 345 100 Wind Withdrawn
GEN-2014-050 Not reported 345 100 Wind Withdrawn
GEN-2023-190 Not reported 115 100 Battery Withdrawn
GEN-2021-102 Not reported 115 80 Battery Withdrawn
GEN-2010-036 Not reported 115 4.6 Hydro Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.