Douglas, KS interconnection queue
2 active projects totaling 163.6 MW in the SPP queue, plus 4 with terminal status (shown grayed).
2active projects
163.6active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2021-101 | Not reported | 115 | 159 | Solar | Active |
| GEN-2013-043 | Not reported | 345 | 100 | Wind | Withdrawn |
| GEN-2014-050 | Not reported | 345 | 100 | Wind | Withdrawn |
| GEN-2023-190 | Not reported | 115 | 100 | Battery | Withdrawn |
| GEN-2021-102 | Not reported | 115 | 80 | Battery | Withdrawn |
| GEN-2010-036 | Not reported | 115 | 4.6 | Hydro | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.
Site Scanner