SPP request GEN-2003-008O

SPP queue ID GEN-2003-008O

Queue request GEN-2003-008O was listed in the SPP interconnection queue at the end of 2025 as a 700 MW coal project in Otoe County, NE, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 1, 2009.

Queue IDGEN-2003-008O
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyOtoe
StateNE
VoltageNot reported
Capacity700 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2009-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Otoe, NE: 5 requests in the SPP queue, 2 active totaling 950 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOPPD
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2003-07-15
Operational date2009-05-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.