Otoe, NE interconnection queue

2 active projects totaling 950 MW in the SPP queue, plus 3 with terminal status (shown grayed).

2active projects
950active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2003-008O Not reported n/r 700 Coal Operational
GEN-2020-004 Not reported 345 250 Solar Withdrawn
GEN-2020-094 Not reported 345 250 Solar Active
GEN-2009-003O Not reported 69 80 Wind Withdrawn
GEN-2013-018 Not reported 69 51 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.