SPP request GEN-2002-004

SPP queue ID GEN-2002-004

Queue request GEN-2002-004 was listed in the SPP interconnection queue at the end of 2025 as a 153 MW wind project in Butler County, KS, according to Berkeley Lab’s queue data file. The filing names Latham as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 15, 2005.

Queue IDGEN-2002-004
Project nameNot reported
Status (as published)Operational
SubstationLatham
Point of interconnectionLatham 345kV
CountyButler
StateKS
Voltage345 kV
Capacity153 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2005-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Butler, KS: 15 requests in the SPP queue, 3 active totaling 738 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterICS-2008-001 Prior Queued; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2002-04-12
Operational date2005-12-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.