Butler, KS interconnection queue
3 active projects totaling 738 MW in the SPP queue, plus 12 with terminal status (shown grayed).
3active projects
738active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2020-086 | Not reported | 345 | 500 | Solar | Withdrawn |
| GEN-2022-161 | Not reported | 345 | 360 | Wind | Active |
| GEN-2023-052 | Not reported | 345 | 300 | Hybrid | Withdrawn |
| GEN-2023-073 | Not reported | 345 | 250 | Battery | Withdrawn |
| GEN-2024-330 | Not reported | 138 | 225 | Battery | Active |
| GEN-2020-076 | Not reported | 345 | 200 | Battery | Withdrawn |
| GEN-2023-024 | Not reported | 138 | 200 | Battery | Withdrawn |
| GEN-2002-004 | Not reported | 345 | 153 | Wind | Operational |
| GEN-2002-012 | Not reported | n/r | 150 | Wind | Withdrawn |
| GEN-2019-047 | Not reported | 138 | 150 | Battery | Withdrawn |
| GEN-2002-003 | Not reported | n/r | 120 | Wind | Withdrawn |
| GEN-2003-023 | Not reported | n/r | 100 | Wind | Withdrawn |
| GEN-2023-002 | Not reported | 115 | 100 | Hybrid | Withdrawn |
| GEN-2019-062 | Not reported | 138 | 90 | Battery | Withdrawn |
| GEN-2016-024 | Not reported | 138 | 55.9 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.