Butler, KS interconnection queue

3 active projects totaling 738 MW in the SPP queue, plus 12 with terminal status (shown grayed).

3active projects
738active MW
15total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-086 Not reported 345 500 Solar Withdrawn
GEN-2022-161 Not reported 345 360 Wind Active
GEN-2023-052 Not reported 345 300 Hybrid Withdrawn
GEN-2023-073 Not reported 345 250 Battery Withdrawn
GEN-2024-330 Not reported 138 225 Battery Active
GEN-2020-076 Not reported 345 200 Battery Withdrawn
GEN-2023-024 Not reported 138 200 Battery Withdrawn
GEN-2002-004 Not reported 345 153 Wind Operational
GEN-2002-012 Not reported n/r 150 Wind Withdrawn
GEN-2019-047 Not reported 138 150 Battery Withdrawn
GEN-2002-003 Not reported n/r 120 Wind Withdrawn
GEN-2003-023 Not reported n/r 100 Wind Withdrawn
GEN-2023-002 Not reported 115 100 Hybrid Withdrawn
GEN-2019-062 Not reported 138 90 Battery Withdrawn
GEN-2016-024 Not reported 138 55.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.