Substation Scout

SPP request ERAS-2025-036

SPP queue ID ERAS-2025-036

Queue request ERAS-2025-036 was listed in the SPP interconnection queue at the end of 2025 as a 140 MW battery project in Potter County, TX, according to Berkeley Lab’s queue data file. The filing names Newhart - Potter Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2029.

Queue IDERAS-2025-036
Project nameNot reported
Status (as published)Active
SubstationNewhart - Potter Line
Point of interconnectionNewhart - Potter 230 kV Line
CountyPotter
StateTX
Voltage230 kV
Capacity140 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Potter, TX: 9 requests in the SPP queue, 2 active totaling 640 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterERAS-2025-001; 05 SOUTHWEST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)ERAS
Queue date2025-10-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first