Potter, TX interconnection queue

2 active projects totaling 640 MW in the SPP queue, plus 7 with terminal status (shown grayed).

2active projects
640active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-266 Not reported 345 500 Hybrid Active
GEN-2023-239 Not reported 230 300 Solar Withdrawn
GEN-2023-238 Not reported 345 280 Solar Withdrawn
GEN-2022-133 Not reported 230 250 Battery Withdrawn
GEN-2023-208 Not reported 115 200 Battery Withdrawn
ERAS-2025-036 Not reported 230 140 Battery Active
GEN-2019-036 Not reported 230 70 Solar Withdrawn
GEN-2019-038 Not reported 230 50 Battery Withdrawn
GEN-2017-107 Not reported 115 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.