SPP request ERAS-2025-022

SPP queue ID ERAS-2025-022

Queue request ERAS-2025-022 was listed in the SPP interconnection queue at the end of 2025 as a 123 MW battery project in Pontotoc County, OK, according to Berkeley Lab’s queue data file. The filing names Monte Vista Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.

Queue IDERAS-2025-022
Project nameNot reported
Status (as published)Active
SubstationMonte Vista Substation
Point of interconnectionMonte Vista 138 kV Substation
CountyPontotoc
StateOK
Voltage138 kV
Capacity123 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pontotoc, OK: 5 requests in the SPP queue, 2 active totaling 270.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityPEC
ClusterERAS-2025-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)ERAS
Queue date2025-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.