Pontotoc, OK interconnection queue
2 active projects totaling 270.5 MW in the SPP queue, plus 3 with terminal status (shown grayed).
2active projects
270.5active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2021-091 | Not reported | 138 | 150 | Solar | Withdrawn |
| GEN-2014-014 | Not reported | 138 | 149.5 | Wind | Withdrawn |
| GEN-2016-102 | Not reported | 138 | 147.5 | Wind | Active |
| GEN-2023-152 | Not reported | 138 | 140 | Solar | Withdrawn |
| ERAS-2025-022 | Not reported | 138 | 123 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.