Pontotoc, OK interconnection queue

2 active projects totaling 270.5 MW in the SPP queue, plus 3 with terminal status (shown grayed).

2active projects
270.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-091 Not reported 138 150 Solar Withdrawn
GEN-2014-014 Not reported 138 149.5 Wind Withdrawn
GEN-2016-102 Not reported 138 147.5 Wind Active
GEN-2023-152 Not reported 138 140 Solar Withdrawn
ERAS-2025-022 Not reported 138 123 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.