Wyandotte, KS interconnection queue
5 active projects totaling 918 MW in the SPP queue, plus 2 with terminal status (shown grayed).
5active projects
918active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-023 | Not reported | 161 | 200 | Battery | Withdrawn |
| GEN-2023-037 | Not reported | 161 | 200 | Battery | Active |
| GEN-2024-319 | Not reported | 161 | 199 | Battery | Active |
| GEN-2024-320 | Not reported | 115 | 199 | Battery | Active |
| ERAS-2025-029 | Not reported | 161 | 170 | Battery | Active |
| ERAS-2025-031 | Not reported | 161 | 150 | Other | Active |
| GEN-2018-062 | Not reported | 161 | 75.6 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.