Substation Scout

Smith, TX interconnection queue

1 active project totaling 180 MW in the SPP queue.

1active projects
180active MW
1total filed
Queue IDProjectkVMWResourceStatus
GEN-2019-065 Not reported 138 180 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first