Richardson, NE interconnection queue
2 active projects totaling 125 MW in the SPP queue, plus 3 with terminal status (shown grayed).
2active projects
125active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2010-035 | Not reported | 161 | 160 | Wind | Withdrawn |
| GEN-2022-152 | Not reported | 161 | 80 | Battery | Withdrawn |
| GEN-2024-231 | Not reported | 161 | 65 | Hybrid | Active |
| GEN-2008-119O | Not reported | 161 | 60 | Wind | Operational |
| GEN-2010-041 | Not reported | 161 | 10.3 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.