Pratt, KS interconnection queue
6 active projects totaling 1,104 MW in the SPP queue, plus 9 with terminal status (shown grayed).
6active projects
1,104active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-215 | Not reported | 345 | 225 | Battery | Withdrawn |
| GEN-2015-024 | Not reported | 345 | 220 | Wind | Operational |
| GEN-2015-025 | Not reported | 345 | 220 | Wind | Operational |
| GEN-2015-090 | Not reported | 345 | 220 | Wind | Operational |
| GEN-2024-257 | Not reported | 115 | 220 | Solar | Active |
| GEN-2014-049 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2023-111 | Not reported | 345 | 200 | Solar | Withdrawn |
| GEN-2023-118 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2009-003 | Not reported | 115 | 199.5 | Wind | Withdrawn |
| GEN-2024-272 | Not reported | 115 | 199 | Hybrid | Active |
| GEN-2006-022 | Not reported | 115 | 150 | Wind | Withdrawn |
| GEN-2023-112 | Not reported | 115 | 130 | Solar | Withdrawn |
| GEN-2010-049 | Not reported | 115 | 49.6 | Wind | Withdrawn |
| GEN-2019-001 | Not reported | 345 | 25 | Wind | Active |
| GEN-2015-043 | Not reported | 345 | 20 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.