Substation Scout

Pratt, KS interconnection queue

6 active projects totaling 1,104 MW in the SPP queue, plus 9 with terminal status (shown grayed).

6active projects
1,104active MW
15total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-215 Not reported 345 225 Battery Withdrawn
GEN-2015-024 Not reported 345 220 Wind Operational
GEN-2015-025 Not reported 345 220 Wind Operational
GEN-2015-090 Not reported 345 220 Wind Operational
GEN-2024-257 Not reported 115 220 Solar Active
GEN-2014-049 Not reported 345 200 Wind Withdrawn
GEN-2023-111 Not reported 345 200 Solar Withdrawn
GEN-2023-118 Not reported 345 200 Wind Withdrawn
GEN-2009-003 Not reported 115 199.5 Wind Withdrawn
GEN-2024-272 Not reported 115 199 Hybrid Active
GEN-2006-022 Not reported 115 150 Wind Withdrawn
GEN-2023-112 Not reported 115 130 Solar Withdrawn
GEN-2010-049 Not reported 115 49.6 Wind Withdrawn
GEN-2019-001 Not reported 345 25 Wind Active
GEN-2015-043 Not reported 345 20 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first