Nowata, OK interconnection queue

5 active projects totaling 1,535 MW in the SPP queue, plus 6 with terminal status (shown grayed).

5active projects
1,535active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-345 Not reported 345 600 Wind Active
GEN-2024-240 Not reported 345 300 Wind Active
GEN-2022-092 Not reported 345 299.2 Wind Withdrawn
GEN-2024-060 Not reported 345 250 Wind Withdrawn
GEN-2024-346 Not reported 138 220 Wind Active
GEN-2022-176 Not reported 345 215 Wind Active
GEN-2009-047 Not reported 345 200 Wind Withdrawn
GEN-2023-075 Not reported 345 200 Wind Withdrawn
GEN-2024-058 Not reported 138 200 Wind Active
GEN-2024-208 Not reported 138 195 Solar Withdrawn
GEN-2023-076 Not reported 345 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.