Substation Scout

Murray, OK interconnection queue

5 active projects totaling 742.5 MW in the SPP queue, plus 8 with terminal status (shown grayed).

5active projects
742.5active MW
13total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-036 Not reported 345 202 Wind Withdrawn
GEN-2009-037 Not reported 345 202 Wind Withdrawn
GEN-2010-004 Not reported 345 202 Wind Withdrawn
GEN-2008-046 Not reported 345 200 Wind Withdrawn
GEN-2024-164 Not reported 138 199 Battery Active
GEN-2016-126 Not reported 138 172.5 Wind Operational
GEN-2024-219 Not reported 138 160 Hybrid Active
GEN-2024-390 Not reported 138 150 Wind Withdrawn
GEN-2011-040 Not reported 138 111 Wind Operational
GEN-2011-013 Not reported 345 101.7 Wind Withdrawn
GEN-2008-033 Not reported n/r 100 Wind Withdrawn
GEN-2008-034 Not reported n/r 100 Wind Withdrawn
GEN-2013-007 Not reported 138 100 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first