Queue IDProjectkVMWResourceStatus
GEN-2021-008 Not reported 345 200 Solar Withdrawn
GEN-2024-185 Not reported 115 199 Battery Withdrawn
GEN-2020-091 Not reported 345 150 Solar Active
GEN-2020-014 Not reported 115 45 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.