Lamoure, ND interconnection queue

1 active project totaling 20 MW in the SPP queue, plus 4 with terminal status (shown grayed).

1active projects
20active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-114 Not reported 230 425 Wind Withdrawn
GEN-2021-024 Not reported 230 203 Wind Withdrawn
GEN-2023-192 Not reported 230 175 Wind Withdrawn
GEN-2018-039 Not reported 115 72 Solar Withdrawn
GEN-2024-SR12 Not reported 115 20 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.