Hughes, OK interconnection queue

1 active project totaling 180 MW in the SPP queue, plus 3 with terminal status (shown grayed).

1active projects
180active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-134 Not reported 138 252 Wind Withdrawn
GEN-2023-003 Not reported 138 200.6 Wind Withdrawn
GEN-2024-116 Not reported 138 199 Hybrid Withdrawn
GEN-2023-205 Not reported 138 180 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.