Henry, MO interconnection queue

4 active projects totaling 1,300 MW in the SPP queue, plus 3 with terminal status (shown grayed).

4active projects
1,300active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-108 Not reported 161 400 Solar Active
GEN-2025-SR1 Not reported 161 400 Battery Active
GEN-2022-168 Not reported 161 380 Solar Withdrawn
GEN-2024-289 Not reported 161 350 Solar Active
GEN-2021-050 Not reported 161 200 Solar Withdrawn
GEN-2020-072 Not reported 161 150 Hybrid Active
GEN-2021-051 Not reported 161 75 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.