Gray, KS interconnection queue
4 active projects totaling 545.6 MW in the SPP queue, plus 8 with terminal status (shown grayed).
4active projects
545.6active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2022-203 | Not reported | 345 | 200 | Solar | Withdrawn |
| GEN-2024-093 | Not reported | 115 | 180 | Solar | Withdrawn |
| GEN-2010-009 | Not reported | 345 | 165.6 | Wind | Operational |
| GEN-2024-030 | Not reported | 115 | 150 | Solar | Active |
| GEN-2024-097 | Not reported | 115 | 150 | Wind | Withdrawn |
| GEN-2007-040 | Not reported | 345 | 131.1 | Wind | Operational |
| GEN-2012-013 | Not reported | 115 | 99 | Wind | Withdrawn |
| GEN-2008-079 | Not reported | 115 | 98.9 | Wind | Operational |
| GEN-2019-079 | Not reported | 115 | 13 | Wind | Withdrawn |
| GEN-2011-003 | Not reported | 115 | 10 | Solar | Withdrawn |
| GEN-2015-026 | Not reported | 345 | 8.3 | Wind | Withdrawn |
| GEN-2015-027 | Not reported | 115 | 4.9 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.